Construction Photos - 2014
Construction Updates - November 2014
Power House
Feeder Line
Construction Updates - October 2014
Feeder Line
Tailrace
Power House
Tunnel
Construction Updates - September 2014
Upper Access Road
Upper Allison Creek - Site of the Diversion Structure
Setting the Penstock
Powerhouse Construction and Penstock Installation
Construction Updates - August 2014 (click on images to enlarge)
Powerhouse Construction
Penstock Installation
Advanced Tunnel Work
Turbine Testing
Punched Through Opposite End of Tunnel; Wednesday, August 13, 2014
Construction Updates - July 2014
Tunnel Portal Construction
Powerhouse Construction
Building the Coffer Dam That is Used to Keep Debris and Particles From Entering the Creek
Helicopter Carrying Equipment to the Upper Access Road Above the Tunnel
Construction Updates - June 2014
Aerial View of Project Site
Aerial View of Access Road and Powerhouse Site
Interior of Outdoor Switchgear Building
Typical Breaker in Outdoor Switchgear Building
Lower Access Road Erosion Control Procedures
Clearing the Site of the Powerhouse
Lower Access Road Beyond the Rock Outcrop
Harris Sand & Gravel Excavators-Lower Access Road
Housing Unit Where Penstock Nozzles will Enter; the Nozzles Control the Quantity of Water Shot at the Turbine Wheel
The Completed Pelton Wheel
Turbine Housing for Pelton Wheel System
Construction Begins - May 2014
View of the Landscape-Lower Access Road being Lower Access Road
Cleared on Left, Site of the Powerhouse on Right
Clearing the Laydown Area
Lower Access Road with Excavators Clearing Road in Distance
Clearing Lower Access Road
Clearing Lower Access Road
Preconstruction
Water in the Creek
Stream Guages Installed to Measure the Hydrology of the Stream in Various Locations
Biologists Added Dye to the Stream to Measure Velocity and Checked Fish Traps to Determine Fish Species
Contractor Crews Performing Boring Tests to Determine the Geological Conditions of the Project Site
Boring Testing